Cedar Creek II

Cedar Creek II

New 34.5kV Collector System
Weld County, Colorado

Realtime provided engineering for the construction of a new 34.5kV Collector System for a 250.8 MW wind park. The wind park consisted of (60) 2.5 MW Nordex wind turbines and (63) 1.6 MW GE wind turbines located in Weld County, Colorado.

Included in this project were design services for wind turbine grounding, DLO/conduit between the transformer and the turbine, installation of approximately (250) miles of underground 34.5kV cable, (123) pad mounted transformers, and approximately (23) junction boxes.