Menu

Criterion Wind Park

Criterion Wind Park

New 34.5kV Collector System
Garrett County, Maryland

Realtime provided engineering for the construction of a new 34.5kV Collector System and the associated 34.5/138kV substation. The project provided an interconnection point for the installation and operation of a 70 MW wind park. The wink park consists of (28) 2.5 MW wind turbines in Garrett County, Maryland.

Included in this project were design services for the installation of approximately (48) miles of underground 34.5KV cable, (28) pad mounted transformers, and (18) pad mounted junction boxes.