New 34.5kV Collector System
Navajo County, Arizona

Realtime provided engineering services for the construction of a 34.5kV Collector System for a 65.1 MW park, consisting of (31) 2.1 MW Suzlon wind turbines.

Included in this project were design services for the installation of approximately (53) miles of underground 34.5kV cable, (31) pad mounted transformers, and approximately (19) junction boxes.