Sublette Wind Park

Sublette Wind Park – GSG Wind Park Phase I

New 34.5kV Greenfield Collector Substation and Switchyard
Illinois (Lee and LaSalle Counties)

Realtime engineered (2) new 34.5kV Collection Systems and the associated Sublette Switchyard, providing an interconnection point for the installation and operation of an 80MW wind park. The wind park consisted of (40) 2 MW wind turbines in Lee and LaSalle Counties, within Illinois.

As part of an Engineering Procurement Construction team, Realtime worked closely with suppliers and contractors in order to maximize design solutions and minimize project duration. Realtime worked closely with Commonwealth Edison to coordinate standards to meet PJM System interconnection requirements.