Top Crop III

Top Crop III

New 34.5kV Collector System
Livingston County, Illinois

Realtime provided engineering for the construction of a 34.5kV Collector System for a 200 MW wind park, consisting of (111) 1.8 MW Vestas wind turbines. The project is located in Livingston County, IL.

Included in the project were design services for installation (mileage yet to be determined), (111) pad mounted transformers, junction boxes, wind turbine grounding, and DLO/conduit from the pad mount transformer to the wind turbine.