Ball Hill Wind

Realtime provided engineering services to construct a greenfield 230kV Point of Interconnection Station (POI). It was be designed in a four (4)-breaker ring bus arrangement, with three (3) breakers. The station shall serve as an interconnection station between a
230kV transmission system, and the Ball Hill Wind Farm LLC Collector Station and the Utilities System facilities. The customer generating facility is rated for approximately 100MW of generation.

 