Bluestone Wind

Realtime provided engineering services for the new 115kV Bluestone Switching Station for the interconnection of the Bluestone Wind Project. The 115kV Bluestone Switching Station was connected to the new Bluestone Wind Project via the CTO AF which consists of an overhead transmission structure, bus supports, a switch support structure, revenue metering, CT/VT combo units, and a 123kV motor operated disconnect switch. The connection was via overhead transmission line. The switch-station was built in a three (3)-breaker ring bus configuration to accommodate the new connection location for the Bluestone Wind Project.