Cooper Mills STATCOM 345kV Substation

Realtime  provided engineering services to install a new breaker and a half rung addition to the existing 345kV Bus and added new 345kV to accommodate a STATCOM installation.

Project Overview

  • Storage Building Specification
  • High Voltage Equipment Specifications
  • Substation Steel Structure Specifications
  • Control cabinet Specifications
  • Physical Design
  • Electrical Design
  • Civil Design
  • Yard Wiring and Conduit and Cable Schedules
  • Calculations (All calculations necessary to support the detailed designs provided)
  • Studies –
  • AC Station Service Study
  • DC Battery Study
  • Lighting Study
  • Construction Specification
  • Construction Sequence Plan
  • Construction and Outage Plan
  • Relay Settings, Integration and Automation Specification
  • NERC CIPv5 Security Review
  • System Equipment Change (SEC) Form Process
  • NPCC Protection System Review Forms (C‐22 forms)