Realtime provided engineering service for a new switching station and collector station for the High Bridge Wind project. The High Bridge switching station was a new 115kV switch-station. The switch-station consisted of three (3) 115kV lines  and one (1) line to High Bridge Wind Substation (Collector).

The collector station for High Bridge Windfarm was designed as a five (5)-bay straight bus configuration. The High Bridge Windfarm collector station will serve as a means of supplying the High Bridge Windfarm’s generation at 34.5kV to the local utilities 115kV system through one (1) 34.5/115kV 75/100/125 MVA transformer. The fifth bay on the straight bus has been added to provide a connection point for a battery storage system.