Realtime provided engineering services for the addition (2) new 345kV bays and (3) new 345-115kV transformers to accommodate a capacity increase at the substation.
Design for installation of new 4th and 5th 345kV bays; installation of new transformers 4T, 5T, and 6T; new relay design integrated with existing annunciation, SCADA, and engineering access systems; new protection and control system, including IEC 61850 protocol and GOOSE messaging for relay-to-relay communications; 345kV control building expansion; 345kV connections from transformers to 345kV bays; 115kV underground connections from new GIS switchgear to the existing line terminal structures; 115kV revenue metering; termination structure foundations; demolition of the existing 115kV switchyard and control building; and 115kV transmission line terminal structure relocation and retrofit.
We attract, hire, train, and empower the most competent workforce in our industry. We do so while partnering with and serving the communities in which we operate by providing vital infrastructure solutions across North America.
Learn MoreThe energy industry makes life possible, but few realize how intertwined the electric power industry is in our daily lives. We engineer the infrastructure that powers your world.
Learn More